United Kingdom · Guide

How to build a composite decking frame

A composite decking frame is a level grid of joists on bearers or supports, with joists at the centres your board manufacturer specifies, double joists where boards butt together, a fall of about 1:100 for drainage and space for air to move underneath.

Updated 30 Oct 2026 United Kingdom · prices in GBP 20 sources

How is a composite decking frame built?

Like any deck frame, with tighter joist spacing and more attention to air. A UK builder building for composite starts with the outer frame, gets it level, then fills in the middle, like laying the edge pieces of a jigsaw first. Decide which way the boards run before you start, because the joists run across them.

What clearance and fall does the frame need?

MakerAir gap or clearanceFall
Eurocell150 mm air gap under the deck10 mm per metre
Guardianboards at least 50 mm off the ground, 90 mm for pressure-treated timber0.5 percent
Cladco Signature30 mm with composite joists, 50 mm with structural or recycled plastic, in poorly ventilated areasabout 5 mm per metre
Ecoscapeat least 25 mm, and not on a flat surface1 percent recommended
Composite Primenot statedat least 1 in 100
Millboardnot statedslight fall away from the building

One builder gives the frame a slight fall rather than dead level and sets posts in concrete with the top sloped away from the post so water doesn’t collect at the ground line. He checks the frame is square by measuring both diagonals, and braces it until the concrete sets.

What materials can the frame use?

Pressure-treated structural timber is the usual choice. Treat every cut end, and put joist tape on the joist tops. Aluminium and recycled plastic joists avoid the rot; see the joists guide for sizes and prices. Millboard’s DuoLift pedestals raise a frame from 15 mm up to 350 mm on a solid base. On very low sites, ask the maker about minimum build height, because most makers need airflow underneath.

What about the frame near doors and drains?

Add bracing where people step out of the door, because a bouncy deck shows most there. Leave an access hatch over drainage covers rather than boarding over them. If the deck must sit level with the door, work out the board thickness first: composite boards run 21 to 32 mm, so swapping boards on an existing frame can raise the surface above the threshold, as one UK owner notes.

Which sub frame kit should I buy?

See frame kits for what a kit holds. Whatever you choose, confirm that the board maker accepts the frame; some warranties require the maker’s own subframe. See how to build decking for the full order of work.

How do you build a decking subframe from timber?

TDCA says deck boards should be pressure treated to at least Use Class 3 for a 15 year service life, while joists, posts and beams should be treated to Use Class 4 whether or not they touch the ground. Use Class 3 covers timber exposed to frequent wetting but out of the ground, and Use Class 4 covers ground or fresh water contact. Its raised-deck code sets C16 as the minimum strength class above 600 mm.

Maker and retailer guidance for the frame:

  • Ecoscape specifies pressure-treated C16 softwood joists, or composite or aluminium ones, fixed to a post set in a concrete foundation. It recommends weatherproofing tape along the joist tops and around cut noggin ends.
  • Wickes’ raised deck guide sets internal joists no more than 400 mm apart, noggins no more than 1,200 mm apart and perimeter posts no more than 1,500 mm apart in holes about 300 by 300 mm and 700 mm deep with a concrete block at the base.
  • BSW says each composite board needs three joists; Ecoscape wants at least 25 mm clearance beneath for drainage and ventilation.
  • Whatever the timber, cut ends, notches and bore holes get two brush coats of end-grain preservative, according to TDCA’s code.

Those raised-deck figures apply to decks above 600 mm on new homes. For a ground-level garden deck, follow your board maker for centres and see joists.

Subframe estimator

Preliminary · not engineering
Deck
m
m
mm
From the manufacturers
mm
mm
Leave blank if you do not have the system’s span table.
14joists
56 mof joist
  • Deck area20 m²
  • Supports per joist—
  • Supports in total—

Support (pedestal or footing) spacing depends on the frame system, load and height. Take it from the frame manufacturer’s span table or an engineer; we do not estimate it.

Timber frames under composite boards must be treated for ground contact where required and checked against the board maker’s frame rules.

This is a preliminary materials count, not an engineering design. It does not confirm spans, load capacity or code compliance.

Ask suppliers for a quote

Questions

How do you build a decking frame?

Set the supports, build the outer frame and level it, fill in the joists at the board maker's centres, add noggins and double joists where boards meet, brace where needed, and give the frame a slight fall. The sections below give the numbers.

What are the framing requirements for composite decking?

A firm base, joists at or below the maker's maximum centres, support under every board end, airflow underneath and a slight fall. Each maker publishes its own clearances and spacing.

Is there a composite decking frame kit?

Kits exist for aluminium and plastic subframes. See our kits page for what a kit includes and what to check. The same spacing and warranty rules apply as for a frame you build yourself.

What is a timber decking frame?

A frame of pressure-treated timber joists and bearers, the most common type. Treat every cut end, use joist tape on the tops and follow your board maker's spacing.

How do you build a decking subframe?

Pressure-treated joists on a firm base, at your board maker's centres. Ecoscape asks for 400 mm centres, 350 mm for Linea, at least 25 mm clearance underneath and joists fixed in at least three places.

Sources

  1. Millboard Installation and User Guide (hosted by Cladco)
  2. HD Deck Pro Fitting Guide and Composite Prime Care & Maintenance Guidelines (Taylor Maxwell, 2022)
  3. Guardian Composite Decking Installation Guide (Sept 2022), hosted by Roofgiant
  4. Eurocell Decking and Balustrade Installation Guide (Issue 1)
  5. Ecoscape Composite Decking Installation Guide, February 2024 (hosted by BM Steel)
  6. Signature Composite Decking installation guide (Cladco)
  7. DuoLift - Millboard UK
  8. A Guide On How To Fit Composite Decking Pedestals - Ecoscape
  9. Decking cost UK - BestBuilders
  10. Installer video: How To Build A Sub Frame For A Decking Project Including Tips (Gareth Wilson)
  11. Installer video: Part 1 Building A Strong Subframe for Raised Decking (KAP Woodwork and Building)
  12. Installer video: Decking design ideas & installation tips (Georgina Bisby DIY)
  13. Installer video: How To Install Picture Frame Composite Decking / Steps / on Concrete Slab / Frontyard / DIY (A Perspective)
  14. Specification for Timber Decking - TDCA
  15. Timber Preservation Treatment - TDCA
  16. Code of Practice: Raised timber deck structures on new homes (TDCA/RD0801 E6)
  17. How to Build a Raised Deck | Wickes
  18. How To Lay Composite Decking On Soil - Ecoscape
  19. Ecoscape Composite Decking Installation Guide (February 2024)
  20. Habitat+ installation guidelines v7 (BSW Timber, via Selco)